2020-08-30 Sunday

Morning time lapse 3m 26s (1h 43m real time)

Lots of help from A and H!

  • Joist hangers added to "front" of floor joists
  • A cuts studs for the back and side walls
  • D starts creating the "California Corner" corner studs

Afternoon time lapse 6m 39s (3h 20m real time)

Kids went to their weekly Sunday afternoon D&D and left P and D to get the floor finished... so many screws!

A bit of prep work for the back wall.

Evening time lapse 2m 5s (1h 3m real time)

Assemble the back wall