2020-09-01 Tuesday
Morning time-lapse - 5m 16s (2h 38m real time)
Nailing the siding onto the front wall - at first D & H, then H then A & H, then A (H headed off to work)
D trims the siding from around two windows
D trims the bottom of the siding
A takes lots of rest breaks to daydream :-)
Raising the front wall with help from our neighbor KB
Lay back wall back down and put siding on
Afternoon time lapse - 1m 42s (51 m real time)
D getting ready to nail siding on back wall - squares back wall
P and A come to help with siding on the back wall
Oh nose - I thought I started another time lapse, but I must have goofed something up... here's what happened during the rest of the afternoon...
P and D finished nailing siding for the back wall (A and H had a pre-arranged D&D session) and trimmed it
A and H came to help with raising the rear wall
P cut the studs and plates for the North wall before heading off for her busy evening
D marked and assembled the North wall framing
D cut the studs and plates for the South wall, and marked the plates
So, here's where things stand...
The North wall is laying down in the shed
The marked up plates for the South wall are in the shed
The studs for the South wall are sitting outside the shed