2020-09-01 Tuesday

Morning time-lapse - 5m 16s (2h 38m real time)

  • Nailing the siding onto the front wall - at first D & H, then H then A & H, then A (H headed off to work)

  • D trims the siding from around two windows

  • D trims the bottom of the siding

  • A takes lots of rest breaks to daydream :-)

  • Raising the front wall with help from our neighbor KB

  • Lay back wall back down and put siding on

Afternoon time lapse - 1m 42s (51 m real time)

  • D getting ready to nail siding on back wall - squares back wall

  • P and A come to help with siding on the back wall

Oh nose - I thought I started another time lapse, but I must have goofed something up... here's what happened during the rest of the afternoon...

  • P and D finished nailing siding for the back wall (A and H had a pre-arranged D&D session) and trimmed it

  • A and H came to help with raising the rear wall

  • P cut the studs and plates for the North wall before heading off for her busy evening

  • D marked and assembled the North wall framing

  • D cut the studs and plates for the South wall, and marked the plates

So, here's where things stand...

  • The North wall is laying down in the shed

  • The marked up plates for the South wall are in the shed

  • The studs for the South wall are sitting outside the shed