2020-10-25 Several Weeks of Progress
2020-10-11: Window sills and framing on the N side...
2020-10-17: The window trim is installed on the front!
2020-10-20: Got the window trim for the "triangle" (S side) done - so the window trim is all done (and all the caulking and priming)
2020-10-21: Done with the painting on the window sills and primed framing
2020-10-23: Got the windows over the door installed - and yes, that's snow falling...
2020-10-25: Installed 2 of 5 bike hangers on Paige's Bike Porch (TM)